Single and complete project

Single and complete project

Single and complete project

The term "single and complete project" is defined at 33 CFR 330.2(i) as the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers. For linear projects, the "single and complete project" (i.e., a single and complete crossing) will apply to each crossing of a separate water of the U.S. (i.e., a single water body) at that location. An exception is for linear projects crossing a single water body several times at separate and distant locations: each crossing is considered a single and complete project. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake, are not separate water bodies. (US Army Corps of Engineers New York District, Regulatory Program Applicant Information Guide, 2014)